Cuyahoga County · Northeast Ohio
Surplus cable from Cleveland's mill and forging substations
Integrated steelmaking still runs along the Cuyahoga, and every one of those plants carries its own substation yard. The cable that comes out of them is heavy, shielded, and usually cut to a duct run that no longer exists.
Request a quote
Request a quote in Cleveland
Tell us the wire type, the quantity and where it is stored.
- Reviewed by a buyer, not a scale
- Reels, pallets, partials or a full truckload
- Anywhere in Ohio, one desk
- 01Send the wire type, quantity and pickup city.
- 02A buyer reviews the lot and replies with a basis.
- 03Freight and release are agreed, then the load is booked.
Lot details
Everything helps, but the wire type, the quantity and the pickup city are enough to start.

A river of mills, each with its own substation
Steelmaking and finishing run along the Cuyahoga in a line that has been rebuilt many times over. Behind each operation sits a substation yard with shielded feeders running out to the mill bays, and when a line is relined or a bay is rebuilt those feeders come out in the lengths they were cut to. The run was sized for a duct that may no longer be there, which is why Cleveland lots arrive in odd pulls rather than round footages.
Forging, heat-treat and heavy fabrication add their own layer: drops to presses, welding leads, and tray cable overhead where a crane cannot reach. Coatings and paint plants on the same corridor contribute process-area cable that never saw daylight, so the jacket print is often still sharp. The biomedical and health-care campuses release less, but what they release stayed indoors.
What tends to be on the rack
A mill lot is rarely one family. Expect EPR or XLPE insulated power cable with copper tape or wire shield, bare copper grounding pulled from the same ducts, and old paper-lead in the runs under the oldest bays. The paper-lead is the item that changes the plan: lead sheath, oil-impregnated insulation, and no way to judge it from the outside. Sorting happens on the ground, not on paper.
- Shielded feeder, 5 kV to 35 kV, copper or aluminum
- Bare copper grounding and counterpoise
- Tray and control cable from process areas
- Lead-sheathed paper-lead from old duct banks
- Welding cable from the fabrication bays
Loading inside a tight river yard
The Flats was laid out for rail, not for a fifty-three foot van. A plant there may have one gate, one scale house and a spotter who decides when a truck may come in. Three reels on a photograph can take most of a day to move if the overhead crane is committed to production.
Release authority is usually split three ways. Engineering owns the cable, environmental owns anything with a lead sheath, and the gate owns the schedule. A seller who knows which of the three has signed saves everybody a wasted morning.
What a reviewer needs before a load is booked
Reel tags photographed face-on, the jacket print where the footage is stamped, and a plain statement of where each reel has sat since it came out: under a crane, on an outdoor rack, or in a duct that took water. For shielded cable the conductor size, insulation type and voltage class carry most of the review.
Cut ends matter as much as tags. A capped end and an open end are different items after a winter, and a reel with one of each is worth describing honestly rather than hoping it goes unnoticed.
Briefs for this city
Related pages
Adjacent cities, wire families and regional briefs.
Questions sellers ask
Can I sell cable that is still in the duct?
Cable still pulled into conduit or duct has to come out before anyone can look at it. Pulling damages jacket and shield, and the length that survives is rarely the length that went in. Most lots from the valley are reviewed after the pull, when the cable is coiled or rewound on a spare reel.
Does lead-sheathed cable go as a separate item?
Yes. Paper-lead is oil-impregnated and lead-sheathed, so it is described and handled on its own rather than mixed into a reel count. Photograph the sheath, the end cap and the tag. Do not open it to inspect the conductor.
Will you take a lot that needs two trucks?
Often that is the only way. A reviewer can work from the reels at the front of a rack and hold the remainder for a second load once the first is weighed. Two loads means two sets of photographs and two weights, so say at the start that the lot is larger than one trailer.
Does outdoor storage ruin shielded cable?
Not by itself. Sun dulls the jacket surface, standing water wicks along the strands at an open end, and freeze-thaw loosens a wooden reel. What matters is how many seasons it sat out and whether the ends were capped. Say both, and photograph the worst reel rather than the best.
Request a quote
Tell the desk what you have in Cleveland
Send the basics and a buyer reviews the lot, usually the same working day.
- Reviewed by a buyer, not a scale
- Reels, pallets, partials or a full truckload
- Anywhere in Ohio, one desk
- 01Send the wire type, quantity and pickup city.
- 02A buyer reviews the lot and replies with a basis.
- 03Freight and release are agreed, then the load is booked.
Second look at the lot
Everything helps, but the wire type, the quantity and the pickup city are enough to start.