Mahoning County · Tube and pipe mills

600 V to 1 kV mill feeder cable in the Mahoning Valley

A tube mill feeder is sized for a drive that starts under load, and it runs in parallel sets because one conductor will not carry the current. When the drive is replaced, the whole set comes out together.

CountyMahoning
RegionMahoning Valley
Voltage600 V – 1 kV
Typical lotParallel sets, 350–750 kcmil

Request a quote

Tell the desk what you have in 600 V to 1 kV mill feeder cable in the Mahoning Valley (Youngstown)

Send the basics and a buyer reviews the lot, usually the same working day.

  • Reviewed by a buyer, not a scale
  • Reels, pallets, partials or a full truckload
  • Anywhere in Ohio, one desk
  1. 01Send the wire type, quantity and pickup city.
  2. 02A buyer reviews the lot and replies with a basis.
  3. 03Freight and release are agreed, then the load is booked.
614-715-3047

Lot details

Everything helps, but the wire type, the quantity and the pickup city are enough to start.

No account, no upload. Photos can follow by text to 614-715-3047.

A line of cable reels standing on bare dirt under a wide blue sky.

Feeders built for a hard start

Mill drives draw heavily at start, so a feeder to a large motor is not one cable. It is three or four parallel runs of 500 or 750 kcmil per phase, in tray or on rack, with a grounding conductor sized to the overcurrent device. That is why a mill feeder lot is heavy, and why it arrives in sets instead of lengths.

The cable is 600 V to 1 kV, single conductor, with XLPE or EPR insulation under a PVC or CPE jacket. Some of it is armored or in conduit; much of it lies exposed on cable rack above the mill floor, where it has spent years in a hot, dirty, vibrating environment.

A parallel set has to stay a set

Four parallel runs of the same size and construction are one item, not four. They were cut to matched lengths deliberately so the current divides evenly, and a set missing a run is worth less than four loose reels, because nobody wants three of a matched four. Keeping the phase markings legible is half of what makes a set a set.

  • 500 kcmil and 750 kcmil single conductor
  • Sets of two, three or four runs
  • 600 V and 1 kV XLPE or EPR
  • Grounding conductor cut to match
  • Rack runs with tray clamps still fitted

Cut-offs from motor replacements

When a mill motor is swapped, the feeder may be re-used and re-terminated, cut back a few feet at each end to get past a damaged lug, or replaced outright. The cut-offs are short, five to thirty feet, and they are the hardest part of the lot to value. A twelve-foot piece of 750 kcmil is a heavy object with no application.

Where the cut-offs match a run still in service they are worth keeping separate and labelled. Where they are mixed, they go by weight. Storing them dry matters, because a wet end on a large stranded conductor wicks water along the strands, and that is a slow problem to discover.

The other thing a motor replacement leaves behind is the old termination kit: potheads, stress cones, lugs and heat-shrink in opened boxes. It belongs with the cable rather than in a skip, because a buyer re-terminating the same cable on the same size lug cares about it. It is not weighed, and it is not what makes the load worth collecting.

Condition and the walk on a mill site

Jacket condition is the first check and the easiest to misjudge. A feeder that ran on rack above a furnace has a jacket that is dusty and maybe discolored but still flexible. The same cable near a cooling bed or a scale may be heat-cracked. Bending a sample over a gloved hand tells you which one you are holding.

Access on a Mahoning Valley mill site is controlled, and old mill buildings have low doors, rail crossings and crane bays a trailer cannot enter. Review includes a walk to see how the cable is stored, a sample cut from each set, and a run measured against the plant's drive schedule.

Back to Youngstown

City brief

The city page carries the county, the industrial base and the logistics that shape a pickup in Youngstown.

Questions sellers ask

Does a parallel set have to be sold as a set?

It reviews better that way. Runs cut to matched lengths are worth more to somebody replacing a single run than four reels of the same cable are separately. If the set is incomplete, the remaining runs are still good cable and are described as an incomplete set rather than as singles.

Is 1 kV mill feeder the same as building wire?

No. It is a single-conductor power cable with a thicker insulation wall and a heavier jacket, made to be pulled in tray or on rack rather than in conduit. Ampacity and outside diameter both differ from building wire of the same conductor size, which is why it is bought on construction rather than on gauge.

What happens to the short cut-offs?

They are collected and reviewed by weight unless they are long enough to be useful. Twelve feet of 750 kcmil has metal value and no installation value. Cut-offs that match a run still in service are the exception, and those are worth keeping labelled and separate from the barrel.

Can feeder cable be re-used after a motor swap?

Often, yes, and mills do it. The questions are whether insulation and jacket survived the disconnect, and whether the ends can be re-lugged cleanly. Cable cut back past the damaged end and re-tested is an ordinary repair, and the cut-off becomes the surplus material.

Request a quote

Tell the desk what you have in 600 V to 1 kV mill feeder cable in the Mahoning Valley (Youngstown)

Send the basics and a buyer reviews the lot, usually the same working day.

  • Reviewed by a buyer, not a scale
  • Reels, pallets, partials or a full truckload
  • Anywhere in Ohio, one desk
  1. 01Send the wire type, quantity and pickup city.
  2. 02A buyer reviews the lot and replies with a basis.
  3. 03Freight and release are agreed, then the load is booked.
614-715-3047

Second look at the lot

Everything helps, but the wire type, the quantity and the pickup city are enough to start.

No account, no upload. Photos can follow by text to 614-715-3047.

Call 614-715-3047 Request a quote