Licking County · Central Ohio
Newark cable from 1890s brick and new data halls
Few Ohio cities hold two eras of electrical work this close together. A luminaire plant with overhead shafting sits twenty minutes from data halls built last year.
Request a quote
Request a quote in Newark
Tell us the wire type, the quantity and where it is stored.
- Reviewed by a buyer, not a scale
- Reels, pallets, partials or a full truckload
- Anywhere in Ohio, one desk
- 01Send the wire type, quantity and pickup city.
- 02A buyer reviews the lot and replies with a basis.
- 03Freight and release are agreed, then the load is booked.
Lot details
Everything helps, but the wire type, the quantity and the pickup city are enough to start.

A plant built around shafting
The luminaire works that has run in Newark since the 1890s was laid out for line shafting and overhead drive, and later adapted to individual motors. The result is a building where the electrical distribution grew in layers: original feeders, mid-century panel additions and modern control wiring on top.
Cable removed from a building like that is unusual. Runs are longer than the drawing suggests, conduit is often full, and the door openings are narrower than anything built in the last forty years. A reel that would load easily elsewhere may need a smaller vehicle here.
Data hall construction next door
Licking County's data-centre corridor produces a completely different lot: over-ordered MC and feeder from fit-out, part boxes of Cat6 and Cat6A, fibre reels and tray cable from the white space. The material is new, tagged and usually still wrapped.
Because the projects run in phases, the surplus arrives in waves. A cancelled phase can release a pallet of identical reels, which is the cleanest kind of lot to review because every unit is the same construction and the same length.
- MC and HCF from interior build-out
- Cat6, Cat6A and fibre from cabling packages
- Feeder from switchgear and panel work
- Tray and control cable from plant services
- Older machine wire from the luminaire works
Moving material out of a brick plant
The practical questions are door width, floor loading and whether a forklift can get to the reel. In a multi-storey brick building the answer is often no, and the material has to come down by lift or by ramp before it reaches a trailer.
Say what the building allows and the plan is built backwards from there. A lot that needs a stair carry is still workable; a lot that needs a crane the site does not have is a different conversation.
What a Newark lot needs
For the older plant: construction, condition and whether the cable was in service until recently. Cable that has sat in a damp basement for a decade is reviewed differently from cable pulled last month.
For the data hall: the phase, the tag and the footage. New material is straightforward once the identity is confirmed, and the identity is almost always on the reel.
Briefs for this city
Related pages
Adjacent cities, wire families and regional briefs.
Questions sellers ask
Can you collect from a multi-storey brick building?
Yes, with the right plan. Say which floor, what the lift can carry and whether there is a ramp or a stair. The material may need to be broken down before it reaches the dock, and that is arranged before the truck is booked.
Is older machine wire worth reviewing?
Sometimes. Older building wire in good jacket condition can still be reused; wire with brittle insulation or cloth braid is usually recovery. The print and a photograph of the cut end settle it quickly.
Do you buy fibre reels from a data hall?
Fibre is reviewed with the rest of the low-voltage package, and the reel count and remaining length matter more than the brand. Keep the reels on their spools rather than coiling them.
Can one submission cover both sites?
Use two submissions. The two lots have different access, different condition stories and different review facts, and keeping them apart avoids averaging a clean data hall reel against a basement pull.
Request a quote
Tell the desk what you have in Newark
Send the basics and a buyer reviews the lot, usually the same working day.
- Reviewed by a buyer, not a scale
- Reels, pallets, partials or a full truckload
- Anywhere in Ohio, one desk
- 01Send the wire type, quantity and pickup city.
- 02A buyer reviews the lot and replies with a basis.
- 03Freight and release are agreed, then the load is booked.
Second look at the lot
Everything helps, but the wire type, the quantity and the pickup city are enough to start.